'C' Type Area of plot 201 sq.m.to 1000 sq.m. permissible covered area:

A50% of the site area

B20% of the site area

C30% of the site area

D40% of the site area

Answer:

A. 50% of the site area


Related Questions:

A fresh detailed estimate of the additional works in additional to the original is known as
Plinth area method is a method of________________
In the specifications of earthwork, initial lead is specified as:
CPM means:
Latest finish time in CPM technique is indicated by a: