Challenger App

No.1 PSC Learning App

1M+ Downloads
Generally adopted method for curing of concrete slab is

Amembrane method

Bponding method

CSprinkling water method

DNone of these

Answer:

B. ponding method


Related Questions:

For a M 50 grade concrete the compressive strength of 150 mm cube upto 28 days in N/mm^2:
The inert material for cement concrete mix is
If a slab is supported on two opposite ends only then the slab is known as.........................
The defect indicated by the curvature formed in the direction of length of timber is :
The nominal mix corresponds approximately to grade M15 is