App Logo

No.1 PSC Learning App

1M+ Downloads
A & B together do a work in 40 days. B & C together do in 25 days. A and B started working together, and A left work after 6 days & B left work after 8 days. After A left, C join the work & C completed the work in 40.5 days, C alone can complete the work in how many days?

A80 days

B120 days

C70 days

D50 days

Answer:

D. 50 days

Read Explanation:

image.png

Let the efficiency of C be x

Now,

6 × 5 + 2 × 8 + 38.5 × x = 200

⇒ 30 + 16 + 38.5x = 200

⇒ 38.5x = 200 - 46

⇒ 38.5x = 154

⇒ x = 4

So, the efficiency of C = 4

So, time taken by C = 200/4 = 50 days



Related Questions:

A pipe can fill the tank in 10 minutes and another pipe can empty it in 12 minutes. If both the pipes are opened the time in which the tank is filled
Two pipes A and B can fill a tank in 20 hours and 24 hours respectively. If the two pipes opened at 5 in the morning, then at what time the pipe A should be closed to completely fill the tank exactly at 5 in the evening?
രാധയ്ക്ക് 10 മിനിറ്റിനുള്ളിൽ 5 കുപ്പി അച്ചാർ നിറയ്ക്കാൻ കഴിയും. 10 മിനിറ്റിനുള്ളിൽ റാമിന് 4 കുപ്പി അച്ചാർ നിറയ്ക്കാൻ കഴിയും. 9 മണിക്കൂറിനുള്ളിൽ രണ്ടുപേരും എത്ര കുപ്പികൾ നിറയ്ക്കും?
20 buckets of water fill a tank when the capacity of each bucket is 13.5 litres. How many buckets will be required to fill the same tank ifthe capacity of each bucket is 9 litres?
A ഒരു ജോലി 60 ദിവസത്തിലും B 20 ദിവസത്തിലും ചെയ്യുന്നു. രണ്ടുപേരും ചേർന്ന് എത്ര ദിവസത്തിനുള്ളിൽ ജോലി പൂർത്തിയാക്കും?