App Logo

No.1 PSC Learning App

1M+ Downloads
An inverted reading is taken when the point is:

AHigher elevation

BBelow line of sight

CAbove the line of sight

DGround level

Answer:

C. Above the line of sight


Related Questions:

The process of hardening the concrete mixes by keeping its surface moist for a certain period is called :
The platform at the end of the series of steps is known as
The coupled roof is suitable for span up to
In roller chain, the bush and the pin form
Sketches can also be drawn by using