Challenger App

No.1 PSC Learning App

1M+ Downloads
Intersection method of plane table survey is also known as

ATwo -point problem

BTraversing

CResection

DGraphic triangulation

Answer:

D. Graphic triangulation


Related Questions:

If drainage is permitted throughout the test, during the application of both normal, and shear stresses so that full consolidation occurs and no ex-cess pore pressure is set up at any stage of the test, is known as..........................
The heading up of water above its normal level while passing under the bridge is known as
The part in excess of hygroscopic water which exist in the pore:
Rocks formed from the magma are
The path traced by the ball thrown up in air, reaches maximum height and travel a horizontal distance is