A and B together take 5 days to do work, B and C take 7 days to do the same, and A and C take 4 days to do it. Who among these will take the least time to do it alone?

AA

BB

CC

DThe data is not sufficient

Answer:

A. A

Read Explanation:

Solution:

Given:

A and B  take 5 days

B and C take 7 days

A and C take 4 days

Solution:

LCM(5, 7, 4) = 140 let total work be 140 unit

Time

Work

Efficiency

5

  140

28

7

20

4

35

The efficiency of A, B, C are

⇒ 2(A + B + C) = 28 + 20 + 35 = 83

⇒ A + B + C = 83/2 = 41.5

⇒ A = (A + B + C) - (B + C) = 41.5 - 20 = 21.5

By the same process

⇒ B = 41.5 - 35 = 6.5

⇒ C = 41.5 - 28 = 13.5

⇒ Time(A) = 140/21.5 = 6.51

⇒ Time(B) = 140/6.5 = 21.54

⇒ Time(C) = 140/13.5 = 10.37

A took the least time to complete the work. So, A is the fastest.

∴ A finishes fastest in 6.51 days.


Related Questions:

10 men can finish a piece of work in 10 days, whereas it takes 12 women to finish it in 10 days. If 15 men and 6 women undertake to complete the work, how many days will they take to complete it ?
P and Q can do a work individually in 15 days and 20 days respectively. Find the respective ratio of their efficiencies.
A ,B, C എന്നീ മൂന്നുപേർ ചേർന്ന് ഒരു ജോലി 12 ദിവസംകൊണ് ചെയ്യും. A, B എന്നിവർ മാത്രം അത് 16 ദിവസങ്ങൾ കൊണ്ട് ചെയ്യും. എങ്കിൽ C ഒറ്റയ്ക്ക് അത് എത്ര ദിവസം കൊണ്ട് ചെയ്യും?
Two pipes are connected to a water tank. The first pipe can fill the tank in 10 minutes and the second pipe can empty it in 15 minutes. If both pipes opened simultaneously, then find the time in which the tank will be completely filled with water.
P works twice as fast as Q. Q alone can complete some work in 12 days. Working together, how long will P and Q take to complete the work?