A and B undertake to complete a piece of work for ₹600. A alone can complete it in 4 days while B alone can complete it in 6 days. With the help of C, they finish the work in 2 days. Find the share of C in the payment received.

A200

B78

C100

D300

Answer:

C. 100

Read Explanation:

A alone complete a work =4 days B alone complete a work =6 days LCM of these two is the work ie =12 efficiency of A=12/4=3 efficiency of B = 12/6=2 A and B are work together the one day work is 5 if C is included the work they will complete the work in 2 days so the efficiency of C is 2 days=12/efficiency of (A+B+C) 2=12/(5+C) 1=6/(5+C) (5+C)=6 C=1 so the ratio of efficiency of A:B:C = 3:2:1 the share of C=600*(1/6)=100


Related Questions:

The efficiency of A, B, and C is 2 : 3 : 5. A alone can complete a work in 50 days. They all work together for 5 days and then C left the work, in how many days A and B together can complete the remaining work?
One pipe fills a water tank 3 times faster than the other. If the two pipes together can fill the empty tank in 37 minutes, then how much time will the slower pipe alone take to fill the tank?
Had been one man less, then the number of days required to do a piece of work would have been one more. If the number of Man Days required to complete the work is 56, how many workers were there?
P is twice as efficient as Q. Q takes 12 days to complete a job. If both of them work together, how much time will they take to complete the job?
A and B can do a piece of work in 28 days and 35 days, respectively. They work on alternate days starting with A till the work gets completed. How long (in days) would it take A and B to complete the work?